Client: Taurus Homes Pittock Reserve is a 32-lot subdivision in the West Hills of Portland. The site is steep, wooded and located entirely within Portland’s Environmental Conservation and Protection zones. Significant portions of the property are impacted with landslide hazards and contain natural drainways, springs and wetlands. CESNW modified the approved PUD to accomodate the […]
Tualatin Library
Client: SRG Partnership/City of Tualatin, Oregon CESNW assisted SRG Partnership with the preliminary evaluation and project scoping of the existing library/administration building for a proposed bond measure. The bond measure was successful and construction was completed in summer of 2008. CESNW prepared the land use application for Architectural Review. CESNW was also responsible for topographic […]
Cook Park Master Plan Land Use Application
Client: City of Tigard, Oregon CESNW assisted the City of Tigard with updating their master plan for Cook Park and the preparation of the land application required for its approval. CESNW prepared the land use application, held a neighborhood meeting, and represented the City at the public hearing. The application was approved.
Willing Parking Lot
Client: Willing Company, Portland, Oregon The Willing Parking Lot occupies a City block in downtown Portland with an existing pay parking lot operated as a holding use until the site is ultimately redeveloped as a high rise office building. The existing parking lot was supported by 4-foot to 18-foot high retaining walls on three sides. […]



